SAN ANTONIO (KTSA News) — The Texas Department of Transportation has announced road and lane closures through the end of the month.

Loop 1604 – North Central San Antonio/Bexar County

  • November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for concrete paving.
  • November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for concrete paving.
  • November 15 until Friday, November 19. Nightly 9 .m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • November 15 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for concrete paving.
  • November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for concrete paving.
  • November 7 until Saturday, November 20. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • November 7 until Saturday, November 20. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • November 7 until Saturday, November 20. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • November 7 until Saturday, November 20. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • October 18 until Tuesday, November 30. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening.
  • October 18 until Tuesday, November 30. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening.
  • November 9 until Tuesday, November 16. Weekdays 9 a.m. until 3 p.m. eastbound frontage road lane closure from the entrance ramp from Bandera Road (SH 16) to Hausman Road for storm drain trenching.
  • November 9 until Tuesday, November 23. Weekdays 9 a.m. until 4 p.m. westbound frontage road lane closure from Hausman Road entrance ramp to Bandera Road exit ramp for high mast illumination installation.
  • November 18 until Monday, December 6. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening.
  • November 18 until Monday, December 6. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening.

Loop 1604 – North West San Antonio/Bexar County

  • November 14 at 6:00 p.m. until Wednesday, November 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Tradesman Drive to Bitters Road for barrier setting.
  • November 14 at 6:00 p.m. until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Stone Oak Parkway to US 281 for barrier setting and striping.
  • November 14 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Drive to Blanco Road for mill and overlay, barrier setting and striping.
  • November 14 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Blanco Road to Tradesman Drive for mill and overlay, barrier setting and striping.
  • November 14 at 6:00 p.m. until Tuesday, November 16. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Lockhill Selma Road for barrier setting and striping.
  • November 14 at 6:00 p.m. until Tuesday, November 16. Nightly 9 p.m. until 5 a.m. westbound mainlane exit ramp to IH-10 / 1604 Intersection closure for barrier setting and striping.
  • November 14 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Huebner Road to Blanco Road for barrier setting.
  • November 14 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Blanco Road to Huebner Road for barrier setting.
  • November 14 at 6:00 p.m. until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Talavera Parkway to Madera Parkway for existing median removal.
  • November 14 at 6:00 p.m. until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from Madera Parkway to Talavera Parkway for existing median removal.

Loop 1604 – Far East San Antonio/Bexar County

  • November 14 until Monday, November 15. 9 p.m. to 5 a.m. Full closure of the mainlanes at the Loop 1604 intersection for bridge work.

US 281 – North Central San Antonio/Bexar County

  • November 13. Daytime 9 a.m. until 3 p.m. Right southbound mainlane closure from Marshall Road entrance ramp to Stone Oak Parkway for barrier work.
  • November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • November 15 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • November 15 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • November 15 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • November 15 until Friday, November 19. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • November 20 until Sunday, November 21. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County

  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • November 14 until Monday, November 15. 8 p.m. to 5 a.m. Double north and southbound mainlane closure at Conrads Lane for bridge deck pour work.
  • November 14 until Friday, November 19. 8 a.m. to 7 p.m. Various southbound frontage road shoulder closures from Schertz Parkway to Retama Parkway for geotechnical and drilling work.
  • November 14 until Friday, November 19. 8 a.m. to 7 p.m. Various lane closures from the median between Loop 1604 eastbound to I-35 southbound mainlanes and frontage road, from Gateway Blvd. to McMorris Blvd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 8 a.m. to 7 p.m. Various lane closures from southbound I-35 frontage road to Loop 1604 frontage road westbound from Gateway Blvd. to Old Austin Rd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 8 a.m. to 7 p.m. Various lane closures from the median between Loop 1604 eastbound to I-35 southbound mainlanes and frontage road, from Gateway Blvd. to McMorris Blvd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single southbound shoulder closure from Loop 1604 to Forum Parkway for geotechnical and drilling work.
  • November 14 through Friday, November 19. 9 a.m. to 4 p.m. Single southbound frontage road closure from Loop 1604 to Forum Parkway for geotechnical and drilling work.
  • November 14 through Friday, November 19. 9 a.m. to 4 p.m. Single southbound frontage road closure from Forum Parkway to Utopia Boulevard for geotechnical and drilling work.
  • November 14 through Friday, November 19. 9 a.m. to 4 p.m. Single southbound frontage road closure from Brightleaf Drive to Retama Parkway for geotechnical and drilling work.
  • November 14 through Friday, November 19. 9 a.m. to 4 p.m. Single southbound frontage road closure from Retama Parkway to N Evans Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various southbound frontage road closures from Mid Cities Parkway to N. Evans Rd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various southbound frontage road closures from Pawlin Drive to Retama Parkway for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single median closure from I-35 southbound frontage road to Loop 1604 westbound frontage road, between Gateway Pl. to I-35 Junction for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various lane closures from southbound I-35 frontage road to Loop 1604 frontage road westbound from Forum Pkwy to Old Austin Rd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various lane closures from Loop 1604 eastbound frontage road ramp to I-35 frontage road southbound from Gateway Blvd. to McMorris Blvd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single lane closure from southbound I-35 frontage road to Loop 1604 frontage road westbound from Forum Pkwy to Old Austin Rd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various lane closures from Loop 1604 eastbound frontage road to I-35 southbound frontage road from IKEA-RBFCU Parkway to McMorris Blvd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single lane closure on I-410 eastbound frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Westbound shoulder closure on I-410 from Fratt Road to Ellis Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single I-410 eastbound frontage road shoulder closure from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single I-410 eastbound frontage road shoulder closure from Vicar Drive to the I-410 Loop interchange with I-35 for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single southbound frontage road lane closure from Walzem Road to Crestwind Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Westbound shoulder closure on I-410 frontage road from the I-410 Loop Interchange to Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various median closures westbound on I-410 and the I-410 off ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various westbound median closures on I-410 frontage road and I-410, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various westbound frontage road shoulder closures on I-410 from Austin Hwy to I-410 for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Various westbound frontage road shoulder closures on I-410 from Austin Hwy to I-410 before joining the I-410 Loop for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single westbound frontage road closure on I-410 from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single left turn only lane closure on Austin Hwy to westbound I-410 frontage road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single southbound I-35 frontage road closure from Whirlwind Drive to Walzem Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 a.m. to 4 p.m. Single westbound frontage road closure on I-410 from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Double southbound mainlane and ramps (as needed) closure from FM 306 to S. Guadalupe River for milling and paving work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single southbound mainlane closure from Crownpoint Drive to Judson Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single southbound mainlane closure from Judson Road to Toepperwein Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single southbound mainlane closure from Toepperwein Road to the I-35 Frontage Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single southbound closure from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single southbound access road closure from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Southbound and northbound turnaround closures at FM 3009 (Roy Richard Dr.), northbound turnaround closure at Corporate Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various southbound frontage road shoulder closures from Schertz Parkway to Retama Parkway for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various southbound frontage road closures from Mid Cities Parkway to N. Evans Rd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various southbound frontage road shoulder closures from Pawlin Drive to Retama Parkway for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various lane closures from the eastbound Loop 1604 exit ramp to I-35 southbound from Gateway Pl. to Gateway Blvd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single southbound mainlane and cloverleaf ramp closure from I-35 southbound to Loop 1604 eastbound for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various lane closures including the entire cloverleaf ramp from Loop 1604 westbound to I-35 southbound for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various lane closures from Loop 1604 eastbound to I-35 northbound from IKEA-RBFCU Parkway to I-35 northbound for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single mainlane I-410 eastbound closure from N New Braunfels to Nacogdoches Rd. for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various lane closures from the I-410 entrance ramp to single lane on I-410 eastbound from Cripple Creek Street to Ira Lee Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Ira Lee Road to Silverstar Street for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Shoulder closure eastbound on I-410 frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various I-410 eastbound frontage road closures (including entrance ramp to I-410), from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single lane closure on I-410 eastbound from Fratt Road to Interchange Parkway for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Entrance ramp to I-410 eastbound and frontage road closures from Quail Creek Drive to Perrin Beitel Rd for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Turnaround closure from I-410 eastbound to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Turnaround closure from I-410 westbound to eastbound frontage road between Perrin Beitel Road and Vicar Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various I-410 eastbound frontage road closures (including I-410 onramp), from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various eastbound ramp closures connecting eastbound I-410 to southbound Austin Highway from the I-410 Loop Interchange to Austin Highway for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various I-410 westbound closures, including ramp connecting northbound Austin Hwy to westbound I-410 from Cross Creek Drive to Vicar Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various I-410 eastbound closures, including ramp connecting northbound Austin Hwy to eastbound I-410 from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single northbound lane closure on Austin Highway to I-410 eastbound frontage road from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single westbound closure on I-410 from Perrin Beitel Road to Starcrest Drive for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Various median closures westbound on I-410 and the I-410 off ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Westbound frontage road ramp closure on I-410 from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single westbound frontage road closure on I-410 from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work.
  • November 14 until Friday, November 19. 9 p.m. to 5 a.m. Single eastbound mainlane closure on I-410 from Post Oak Road to Norwich Drive for geotechnical and drilling work.
  • November 14 until Saturday, November 20. 8 p.m. to 5 a.m. Double northbound mainlane and ramps (as needed) closure from FM 2252 to FM 1103 (Hubertus Rd.) for milling and asphalt work.
  • November 14 until Saturday, November 20. 8 p.m. to 5 a.m. Double southbound mainlane and ramp closure from FM 1103 (Hubertus Rd.) to FM 2252 for milling and asphalt work.
  • November 15 until Friday, November 19. 8 a.m. to 5 p.m. Single southbound frontage road from FM 306 to Nissan Way for sidewalk work.
  • November 15 until Friday, November 19. 8 a.m. to 5 p.m. Single northbound frontage road from FM 306 to Town Center Drive for removing temporary concrete traffic barrier.
  • November 15 until Saturday, November 20. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road from FM 2252 to FM 1103 (Hubertus Rd.) for cleaning and landscape work.
  • November 15 until Saturday, November 20. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road from FM 2252 to Schwab Rd. for cleaning, landscape, striping, sidewalk and driveway work.
  • November 15 until Saturday, November 20. 9 a.m. to 5:30 p.m. Single southbound frontage road from FM 1103 (Hubertus Rd.) to FM 2252 for cleaning and landscape work.

I-410 – West San Antonio

  • Current until Monday, November 15. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, November 15. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Monday, November 15. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, November 15. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • November 15 until Monday, November 22. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • November 15 until Monday, November 22. 8 p.m. to 5 a.m. Full closure of the northbound frontage road lanes from Meadow Breeze Dr. to SH 151 for bridge work.
  • November 15 until Monday, November 22. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • November 15 until Monday, November 22. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.

I-410 – Southwest San Antonio

  • Current until Friday, December 31. Left lane closure on the northbound frontage road from Ray Ellison Blvd. to Medina Base Rd. for roadway rehabilitation.
  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd.

SH 151 – West San Antonio

  • Current until Monday, November 15. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, November 15. 8 p.m. to 5 a.m. Full alternating closure of the mainlanes, in both directions, at SH 151 for bridge work.
  • Current until Monday, November 15. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • November 15 until Monday, November 22. 8 p.m. to 5 a.m. Alternating full closures of the mainlanes, in both directions, at Loop 410 for bridge work.
  • November 15 until Monday, November 22. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.

Alamo Ranch Parkway – Bexar County

  • November 14 until Tuesday, November 16. 9 p.m. to 5 a.m. Full closure of the Westwood Loop for bridge work.
  • November 19 until Monday, November 22. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Loop 1604 to Lone Star Parkway for paving operations.

FM 1535 – N.W. Military Highway

  • November 15 until Friday, November 19. 9 a.m. to 4 p.m. Single northbound lane closed at the Wurzbach Parkway intersection for curb and sidewalk work.
  • November 15 until Friday, November 19. 9 a.m. to 5 p.m. Single lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work.

US 181 – Bexar County

  • Current until Tuesday, November 23. 7 a.m. to 7 p.m. Single lane closures, in both directions, from Wilson County Line to I-37 for road repairs.

FM 2252 – Nacogdoches Rd.

  • November 13 until Sunday, November 14. 6:30 a.m. to 8 p.m. Single lane closures, in both directions, at the Evans Rd. intersection for asphalt operations.

I-10 – Kendall County

  • Current until December 2021. Full closure of the eastbound exit 540 ramp to SH 46/Bandera Rd. for roadway construction. DETOUR: Traffic will be diverted to the US-87 exit ramp and use the Scenic Loop Rd. turnaround.

Loop 337 – Comal County

  • Current until Friday, November 19. 8 a.m. to 5 p.m. Single lane closures, in both directions, at River Rd. for bridge work.

More about: